Is GD Properties Safe?
Short answer: we cannot call any developer safe for you, but here are the facts and the checks. KL360 has an unusual history, so it deserves a closer look than most.
What we know
All of this comes from an EdgeProp / The Edge Malaysia report dated 1 May 2026.
- Who they are. GD Properties is based in Negeri Sembilan. KL360 is its first project in the Klang Valley.
- The site’s history. The land on Jalan Tun Razak was meant to be M101 Skywheel, a 78-storey twin-tower project with a ferris wheel. It launched in 2017 under M101 Holdings, and work stopped around 2022 to 2023.
- What GD did. The group CEO said GD Properties bought the abandoned project about two years before the launch and changed the design, with the architect Veritas Design Group, to cut the number of floors.
- What KL360 is. A RM1.37 billion mixed-use project with 61 storeys, 785 serviced apartments, 221 office suites and 20 retail units. It is next to Raja Uda MRT station.
- Who builds it. China State Construction Engineering (M) Sdn Bhd is the main contractor, with construction due to start in the second half of 2026 and finish by 2030.
- Financing. At the launch, GD Properties signed a letter of agreement with Bank Rakyat for RM182 million of financing for the development. A letter of agreement is not the same as money drawn down.
What this means for a buyer
In its favour: a large, experienced main contractor, a bank financing letter, and a site next to an MRT station.
Worth thinking about: it is a first Klang Valley project for this developer, the site has already failed once under another company, and completion is about four years away.
What we could not confirm
- The sources do not say what happened to buyers of the original M101 Skywheel project. Ask the sales team and your lawyer.
- We have no track record of GD Properties finishing projects in the Klang Valley, because this is its first.
What to check yourself
- Ask your lawyer to check the land title and confirm the land is free of claims from the earlier project.
- Ask what protects your payments. Find out how progressive payments are held and released, and whether the housing-law protections apply to your unit. Serviced residences can sit on commercial title. See our guide on late delivery and the Homebuyer Tribunal.
- Ask for the financing details. What has the bank actually approved, and what stage is it at?
- Visit the site and see the actual progress on the ground, not only the artist’s impression.
- Read the operator contract if the 5% minimum yield matters to you. Our KL360 review explains what it is and is not.
Our view
An abandoned site is a risk, and a disclosed one is better than a hidden one. If you decide to buy, do it after your lawyer has checked the items above, not before.
Read the full KL360 review or ask me on WhatsApp.
Frequently Asked Questions
Sources & verification — EdgeProp / The Edge Malaysia: GD Holdings revives abandoned M101 Skywheel project with RM1.37b KL360 mixed-use development (1 May 2026) (2026-05)
We cite official and primary sources wherever a claim can be checked. Rules and prices change — we re-verify everything at transaction time. Figures last verified: November 2026.
Ask me directly on WhatsApp
Send a message and I'll reply — usually within minutes. No form, no call-back queue.
Get the KL360 unit-by-unit table