Read This First
I market some of these projects, so read this knowing that. Every figure below comes from the project’s own review page, which names its sources. Where something is my reading rather than a source, I say so.
Side by Side
| KL360 | Eaton Residences | |
|---|---|---|
| Location | Jalan Tun Razak, Kampung Baru | 26 Jalan Kia Peng, KLCC |
| Tenure | Freehold | Leasehold to 2114, commercial title |
| Status | New launch; completes 2030 | Completed Q1 2022, operating |
| Entry price | RM680k net (470 sq ft); from RM1,308 psf net | From RM1.31M net (840 sq ft), after rebate |
| Rail | About 50m to Raja Uda MRT | 130m to Conlay MRT (sponsor) |
| Rental terms | 5% minimum yield on net price, 5+5 years; then 70/30 pool | 5% a year gross on net price, 24 months, selected units |
| Maintenance | RM0.66 psf, sinking fund included | RM0.65 psf (sponsor) |
| Units | 785 serviced apartments plus 221 office suites | 632, single tower |
The Real Trade-Off
Eaton gives you income now and a shorter lease. The building is finished and operating, the package pays from day one, and you buy something you can walk through. The cost is tenure, about 88 years of lease, and a package that ends after 24 months.
KL360 gives you freehold and a longer contract, but you wait. Keys come in 2030. In return you hold freehold land, a 5+5 year minimum yield, and the lower entry price. Read the break-even occupancy on the KL360 review, because the floor and the real yield are different numbers.
What to Check on Each
KL360: four years of construction and market risk, and a guarantee that depends on the entity behind it. Eaton: your income plan for the years after the 24-month package, and how your bank treats a commercial title.
Who Each Suits
Choose Eaton if you want a finished building with income straight away and accept leasehold. Choose KL360 if you want freehold and a long rental contract and can wait until 2030.
Full reviews: KL360 and Eaton Residences. See also freehold vs leasehold for foreigners.
Tell me your budget and what you want the unit to do, and I will say which one fits. WhatsApp me. Figures are from the sources named on each project’s page. Confirm everything in the SPA before you decide; this is not legal or financial advice.
Frequently Asked Questions
Sources & verification — The Edge Malaysia — KL360 / GD Properties launch coverage (2026-04 to 2026-06), The Edge Malaysia — GD Properties interview (2026), iProperty — Eaton Residence, Jalan Kia Peng (leasehold expiry 2114, Level 51 cantilevered sky pool, Malaysia Book of Records) (2026), iProperty — Eaton Residence (City View Ventures, GSH subsidiary; single tower, 632 units, 1.42 acres, completed 2022) (2026)
We cite official and primary sources wherever a claim can be checked. Rules and prices change — we re-verify everything at transaction time. Figures last verified: November 2026.
Ask me directly on WhatsApp
Send a message and I'll reply — usually within minutes. No form, no call-back queue.
WhatsApp me — send the unit, I'll run the numbers